Innovative bridge designs for rapid renewal [electronic resource] : ABC toolkit / HNTB Corporation ... [et al.].

Saved in:
Bibliographic Details
Published: Washington D.C. : Transportation Research Board, 2013.
Online Access:
Corporate Authors:
Series:SHRP 2 report ; S2-R04-RR-2.
Subjects:
Format: Electronic eBook
Detail
Summary:"TRB's second Strategic Highway Research Program (SHRP 2) SHRP 2 Report S2-R04-RR-2: Innovative Bridge Designs for Rapid Renewal: ABC Toolkit describes standardized approaches to designing and constructing complete bridge systems for rapid renewals. The report includes design standards and design examples for complete prefabricated bridge systems, and proposes specification language for accelerated bridge construction systems, which adheres to the American Association of State Highway and Transportation Officials (AASHTO) Load and Resistance Factor Design (LRFD) Bridge Design and Construction Specifications. The R04 MathCAD files for the SHRP 2 Report S2-R04-RR-2 are available to help illustrate the sample accelerated bridge construction (ABC) design calculations. The sample design calculations serve as training tools for engineers to increase familiarity with ABC design issues and criteria. A demonstration project on US 6 over the Keg Creek near Council Bluffs, Iowa was completed in 2011 using the accelerated bridge construction standards developed as part of Renewal Project R04. The following three videos were produced related to the Keg Creek project: ABC for Everyday Bridges (18:39) highlights the specific techniques used to deliver a new bridge with only a 10-day closure. One Design--10,000 Bridges (9:46) describes a tool kit for designing and constructing bridges that brings home the benefits of accelerated bridge construction techniques so local contractors can use typical equipment to build bridges quickly and efficiently. Time-Lapse Video (1:30) shows ABC techniques being used by a local contractor with standard equipment to replace the Keg Creek three-span bridge. SHRP 2 Renewal Project R04 also produced the Innovative Bridge Designs for Rapid Renewal report that documents the development of standardized approaches to designing and constructing complete bridge systems for rapid renewals"--Publication info.
Physical Description:1 online resource (xii, 307 p.) : ill.
Other Title:
Other format:Print version: Innovative bridge designs for rapid renewal. 9780309129527
Notes:At head of title: The Second Strategic Highway Research Program.
Title from PDF title page (viewed on July 30, 2013)
Description based on print version record.
Bib#: 1947970
Bibliography:Includes bibliographical references (p. 39-40).
Series:SHRP 2 report ; S2-R04-RR-2
Language:English
Bib#:1947970