|
|
|
|
LEADER |
00000nam a2200000 a 4500 |
001 |
1755317 |
005 |
20120611093300.0 |
008 |
120060s2012 nz a f b 000 0 eng d |
035 |
|
|
|a (OCoLC)795124690
|
040 |
|
|
|a CU
|c CU
|
043 |
|
|
|a u-nz---
|
097 |
|
|
|3 Bib#:
|a 1755317
|
100 |
0 |
|
|a Campbell, Craig
|q (Craig Stuart)
|
245 |
1 |
2 |
|a A review of the processing and storage options for RAP in Fulton Hogan's Wellington business unit and, review the existing asphalt production facilities to enable the business unit to become RAP capable :
|b division, Industries Division, Fulton Hogan Welliington : a project report submitted in partial fulfilment of the requirements for the degree of Master of Engineering Management at the University of Canterbury /
|c by Craig Campbell.
|
260 |
|
|
|c 2012.
|
300 |
|
|
|a 1 v. (various foliations) :
|b col. ill. ;
|c 30 cm.
|
500 |
|
|
|a Typescript (photocopy).
|
500 |
|
|
|a At head of title: FH Fulton Hogan.
|
500 |
|
|
|a "Project report."
|
504 |
|
|
|a Includes bibliographical references.
|
610 |
2 |
0 |
|a Fulton Hogan Limited.
|b Industries Division.
|
650 |
|
0 |
|a Pavements, Asphalt
|x Recycling
|z New Zealand
|z Wellington.
|
650 |
|
0 |
|a Asphalt plants
|x Energy consumption
|z New Zealand
|z Wellington.
|
710 |
2 |
|
|a Fulton Hogan Limited.
|
991 |
|
|
|a 2012-03-16
|
992 |
|
|
|a Created by julew, 16/03/2012. Updated by gewh, 11/06/2012.
|
999 |
f |
f |
|i 5c6e4343-475f-55bc-917c-2426d3f7addc
|s db832051-8b00-5fb7-8622-0facfc5ab8dc
|t 0
|
952 |
f |
f |
|p Library use only
|a University Of Canterbury
|b Storage
|c MB Warehouse
|d Macmillan Brown Library Storage, Thesis Collection, Request for use in MB Library
|t 0
|e Thesis (Engineering Management)
|h Local
|i Thesis
|m AU18041493B
|