|
|
|
|
LEADER |
00000ngm a2200000Ia 4500 |
001 |
1070490 |
005 |
20080130114500.0 |
007 |
vd cvaizq |
007 |
co cga|||||||| |
008 |
050210s2004 mdu050 vleng d |
097 |
|
|
|3 Bib#:
|a 1070490
|
035 |
|
|
|a 11617412
|
035 |
|
|
|a (OCoLC)ocm57613589
|
035 |
|
|
|a (OCoLC)57613589
|
040 |
|
|
|a IXA
|c IXA
|d OCLCQ
|d UNA
|d VP@
|d OCLCA
|
043 |
|
|
|a n-us-sc
|
050 |
|
4 |
|a TG25.C66
|b E98 2003
|
245 |
0 |
0 |
|a Extreme engineering.
|p Cooper River Bridge
|h [videorecording] /
|c produced by Powderhouse Productions for Discovery Channel ; produced and directed by Chris Schmidt ; written by Megan Reilly, Dan Rote.
|
246 |
3 |
0 |
|a Cooper River Bridge
|
260 |
|
|
|a Silver Spring, MD :
|b Discovery Channel,
|c c2004.
|
300 |
|
|
|a 1 videodisc (50 min.) :
|b sd., col. ;
|c 4 3/4 in.
|
538 |
|
|
|a DVD.
|
500 |
|
|
|a Title from disc label.
|
500 |
|
|
|a "Season 2. Episode 6."
|
511 |
0 |
|
|a Narrator, Nick Schatzki.
|
508 |
|
|
|a Camera, Gary Henoch ; editor, Daniel Gaucher.
|
520 |
|
|
|a Builders work to construct the longest cable-stay bridge in America, a 500 foot, eight lane bridge connecting Charleston, South Carolina with Mount Pleasant.
|
500 |
|
|
|a Originally broadcast on the television series Extreme engineering.
|
650 |
|
0 |
|a Cable-stayed bridges.
|
650 |
|
0 |
|a Bridges
|z South Carolina.
|
650 |
|
0 |
|a Bridges
|x Design and construction.
|
700 |
1 |
|
|a Schmidt, Chris.
|
700 |
1 |
|
|a Reilly, Megan.
|
700 |
1 |
|
|a Rote, Dan.
|
700 |
1 |
|
|a Schatzki, Nick.
|
710 |
2 |
|
|a Powderhouse Productions.
|
710 |
2 |
|
|a Discovery Channel (Firm)
|
730 |
0 |
|
|a Extreme engineering (Television program)
|
991 |
|
|
|a 2008-01-30
|
992 |
|
|
|a Created by gewh, 30/01/2008. Updated by gewh, 30/01/2008.
|
999 |
f |
f |
|i 32361658-7dbb-5319-8522-9aac207f48ef
|s 5f8190af-02bf-573d-8aaa-f5bb0533264d
|t 0
|
952 |
f |
f |
|p For loan
|a University Of Canterbury
|b UC Libraries
|c EPS Library
|d EPS Library, Level 1, DVD Collection
|t 0
|e DVD 08/25
|h Local
|i DVD
|m AU15012166B
|